Background Image
Previous Page  155 / 404 Next Page
Information
Show Menu
Previous Page 155 / 404 Next Page
Page Background

A brief about the project

Project name

Location: Al Jahra governorate.

Development and maintenance of Alabdali road

between Mutla'a city exit in the most south intersection

(1) and the suggested intersection (5) 26.2km length.

Improve Al-Abdely road from the future Mutla’a city to

the intersection with the northern regional road.

Location: Al Jahra governorate.

Development and maintenance of Alabdali road

between intersection (5) and Al-Abdely borders 41.5km

length.

Improve Al-Abdely road from the future intersection

with the northern regional road to Al-Abdely borders.

Location: Hawalli governorate – South Surra area.

Aim to solve expected traffic congestion problem when

the projects being implemented in that area end.

Construct, complete and maintenance roads, bridges

and other services in South Surra including the

intersections from Damascus street and King Faisal.

Location: Hawalli governorate – South Surra area.

Aim to solve expected traffic congestion problem when

the projects being implemented in that area end.

Construct, complete and maintenance roads, bridges

and other services in South Surra including

intersections from 5

th

ring road to King Fahad road.

The project extend for 22km from the 6th ring road at

Al-Salmi road direction and meet intersection 82 with

the regional road south part and Al-Abdali linked road

(east – west) to connect the north & the south of

Kuwait.

Construct, complete and maintenance the northern

regional road from 6

th

ring road to intersection no (4).

The project extend for 23km at Al-Salmi road direction

and meet intersection 58 with the extension of the 7th

road, the project involves 4 intersections and parking

and rest house.

Construct, complete and maintenance the northern

regional road from intersection (4) to intersection (8).

The project extend for 56km to the Saudi Arabia

kingdom border entry, the project involves 5

intersections and parking and rest house.

Construct, complete and maintenance the northern

regional road from intersection (8) to Al-Salmy Entry.

Total length approximately 6.5 km.

Construct and maintenance Al-Ghous street from 5th

ring road to 6th ring road.

Total length approximately 9 km.

Construct and maintenance Al-Ghous street from

Sabah Al-Salem area to 7

th

ring road.

Total length approximately 10 km.

Construct and maintenance Al-Ghous street from 7

th

ring road to Al-Fahaheel road Al-Ahmadi no (212).

Location: Kuwait city (the capital).

Infrastructure of roads, storm water drainage, sewage

and other utilities.

Construct, complete and maintenance roads and

rainwater drainage sewers and other services east Al-

Sulaibikhat.

Location: Al Jahra governorate.

Construction of asphalt road 27.5km length two ways

with (3 lanes) and (4) bridges plus lighting works, storm

water drainage and other civil works.

Construct and design roads and other services to

execute the new road from Al-Subiya road to Buhaith

Gate.

Follow / A statement about the Roads future projects in the final design stage

الباب الأول

المشاريع

Chapter 1 - Projects

الدليل الإحصائي السنوي

Statistical Year Book

155

3-

أهم المشاريع المستقبلية

The most important

Future projects