A brief about the project

Project name

Location: Al Jahra governorate

5th ring road:

Renovation 7.6 of the main road to be 8 lanes instead of 6 lanes

except the Passages, and two lanes 5.5 km two ways on the two

sides of the road, plus build bridges and pedestrian bridges will

be installed.

Al-Dowha highway:

Connect the 5th ring road with Al-Dowha highway

Build 5 car bridges

Build roads, passages, lights, traffic signs, sanitary and other

engineering works to roads and crossroads.

Construct & complete intersections on the

western part of 5

th

ring road.

Location: Al Farwania governorate

Expand the main roads around the administrative & trading

center in Khaitan to be two lanes with traffic island and implement

other roads serve the new police station and the rest trading

centers plus many parking serve the Existing and future facilities

at area by extending the length of roads approximately (2.5km)

and parking size (36,500m2).

New internal roads and car parking to general benefit societies at

Jleeb Al-Shuyoukh area block 5 by increasing the roads length

with approximately (1.7km) and parking size (16,578m2).

Build and fulfill roads and services in

Khaitan around the administrative & trading

center, & Jleeb Al-Shuyoukh area around

the buildings specialized for general benefit

societies.

Location: Al Farwania governorate

Improve the standard of traffic service at Avenue's mall area

according to the traffic crowded at area and this project involves

some suggestions for examples:

- Direct entry from AlGhazali road going south to the side road 2

parallel the Avenue's mall.

- Entry & Exit from the side road 2 parallel the Avenue's mall

north to the linked road between the airport road and AlGhazali

road.

- Direct entry from the 5th ring road both sides to the eastern

side road parallel the Avenue's mall.

- New road connect the airport road and AlGhazali road with 3

lanes.

Construct, complete & maintenance roads

and bridges and sewage drainage and

rainwater drainage sewers between the Fifth

Ring Road and Al-Ghazali and Muhammad

bin Qasim Street.

The project involves Study the possibility of improving and

developing the existing road (30) which suffers crowded traffic

so that road has to be improved to cope with this increase and to

improve the traffic services standard.

Implement, fulfill and maintenance of

Fahaheel highway road (road 30).

A statement about Roads projects which is being prepared for presenting