Background Image
Next Page  63 / 404 Previous Page
Information
Show Menu
Next Page 63 / 404 Previous Page
Page Background

الباب الأول

المشاريع

Chapter 1 - Projects

Second:

Intersections on the Sixth Ring Road main roads that

lead to Al Jahra area :

87 km

Total road length

5

Number of intersections

5

Number of flyovers

الدليل الإحصائي السنوي

Statistical Year Book

63

1-

الإنجازات

Achievements

Completion date: August 2014

The project aims to improve, develop, and increase the

performance of the road network in accordance with the

latest global standards and international standard

specifications for highways, streamline the traffic, and

raise the traffic safety level on the road network.

The project includes the construction of flyovers to get

around intersections with the introduction of service roads

and create all services related to roads, bridges and

tunnels.

The project serves the entrances and exits of Saad Al-

Abdullah area, Industrial Amghara Area, Al Jahra

Industrial Area, and Al Naseem Area.

The project consists of:

4 flyovers to get around intersections No. 3 and No. 1.

A free full-length intersection and a flyover of 800 meters

long on intersection No. 4.

A free full-length intersection in roundabout No. 5 with 2

loops.

Construction of a tunnel and a roundabout above it in

intersection No. 7.

Deportation of electricity, water, and phone services, and

create all the services associated with roads and bridges

and tunnels.

Statistical data about the project :