Background Image
Next Page  255 / 408 Previous Page
Information
Show Menu
Next Page 255 / 408 Previous Page
Page Background

Chapter 2

– Statistical Data –

4

) The Maintenance

Work Site

Work Description

6- Sand removal work

Different

Governorates

Highways:

Remove sand and waste on highways in different places.

Sandy works in Al-Wafra road 306.

Processes:

Remove the sand from Al-Al-Salmi road.

Remove the sand from Al-Subiya road.

Remove the sand from Kabd road.

Remove the sand from Al-Abdali road.

Remove the sand from Mina AbdAllah - Al-Wafra road.

Al-Ahmadi

Remove the sand from Southern area roads.

7- Planning works for Ground traffic signs

Different

Governorates

Processes:

Sheikh Sabah Al-Salem Al-Sabah road (Al-Salmi).

Sheikh Jaber Al-Ahmad Al-Sabah road (Al-Abdali).

Al-Liyah road.

Al- Faiha block 6, 7, 8.

Sabah Al-Salem block 12.

8- Cleaning works Sewage Rainwater network and video recording

Different

Governorates

Highways:

Cleaning the Sewage Rainwater network on the highways.

Development of rain lines down Fahaheel Highway.

Create a concrete course on King Fahad Road.

Make stream discharge concrete in west Om Al-Haiman on King Fahad Road.

Linking works in the open sewer network to drain the rain in drain-based in Om Al-Haiman.

Development of open sewage rain network and dams to protect the rain floods in Om Al-Haiman.

Clean Hawally Governorate rain Network.

Processes:

Video recording and general maintenance of the sewage rainwater networks in areas: Kuwait City,

Shuwaikh Residential, Medical Shuwaikh, Al-Shamiya, Al-Faiha, Al-Khaldiya, Kaifan, Al-Rawda, Al-Yarmouk,

Al-Salmiya, Al- Shaab, Hawally, Al-Rumaithiya, Al-Zahraa, Al-Shohada, Granada, Salwa, Ishbiliya, Al-

Rehab, Al-Qayrawan, Al-Doha, Al-Dajeej, Khaitan, Al-Farwaniyah, Omariya, Jeleeb Al-Shuyoukh, Al-Qurain,

Al-Fahaheel, Assabahiyah, Al- Adan, Al- Qusor, Ahmadi, Al- Mangaf, Fahad Al-Ahmad Al-Sabah, Mubarak

Al-Kabeer, Abu Fatira, Al-Masayel, Abu Halifa, Al-Jahra Industrial, Al-Oyoun, Abdullah Al-Mubarak, Al- Qasr,

Tayma , Al- Naeem, Old Al-Jahra, Sulaibikhat and Saad Al-Abdullah.

Arabian Gulf street.

Cleaning cloaca exits in Al-Asimah and Hawally Governorates.

Treating cloaca in: Sabhan, Al-Yarmouk, Al- Qusor, Al-Fnaitees and Al- Adan.

A detailed statement about the most important works completed within the road maintenance (contracts)

during 2015

255

Statistical Year Book

الدليـــل الإحصــائــي الســـنوي