Background Image
Next Page  289 / 404 Previous Page
Information
Show Menu
Next Page 289 / 404 Previous Page
Page Background

An overview to the most important future road projects

No. of

interchanges

Approximate

length (km)

Project name*

14

127

Regional road – Southern part – Phase 1:

The project aims to create a new highway with international standards specifications

from the future Al-Salmi intersection point with Al-Nuwaisib intersection point until al-

Nuwaisib southern borders.

16

88

Regional road – Southern part – Phase 2:

Establishing a new highway link to connect the Seventh Ring Road with the southern

part of the regional road – part 1 – and that is with the future intersection point.

20

175

Regional road – Northern part – Phase 1:

Development and improvement of the Abdali highway starting from the northern

borders of Al-Abdili and ends at the intersection no.35 in Jahra – Abdili road with the

Sixth Ring Road.

Establishing a new highway with standard specifications starting from the future Al-

Salmi road’s intersection and ends at its intersection with Abdili highway

Establishing a new linking road (Eastern – Western) between Abdili and its

intersection with Subiya highway .

13

101

Regional road – Northern part – Phase 2:

Developing the current Al-Salmi highway (Called “Al-Atraf” no.70 previously, starting

from intersection no.64 (Atraf road with the Sixth Ring Road) and ends at al-Salmi

borders’ point.

4

65

The modern road from Subiya city to the Abdili borders:

Creating a new highway from Al-Subiya city through Baheth area. It will be extended

to reach the Abdili borders.

17

130

Connecting roads between Subah Al-Ahmed residential area and Al-Khairan

residential area:

Developing road 309 & 306 with the road that connects them on the current

roundabout.

8

15

(6.5) Ring Road Highway:

Creating a new highway starting from the Seventh Ring Road and the future

intersection and ends at the future intersection point of Al-Muqawa road. It also

includes the improvement and development of the current road no.602 between Jileeb

Al-Shyukh area and the new University City in Al-Sheddadiya.

Development

of 26 existing

intersection

30

Al-Ghoos Street’s development:

The development of Al-Ghoos Street that is extending from the south of Fahaheel

road to the Fifth Ring Road to the north, and that is to fit with the expected traffic

growth resulting from the new and currently existing residential areas within the scope

of the project..

9

40

Al-Nuwaiseb Road:

The project’s borders extend from intersection no.19 on the meeting point of Fahaheel

road and Riyadh road to the border area with Saudi Arabia. The road’s efficiency will

be raised in addition to introducing of upper turns instead of the current turns as well

as creating new upper intersections with the main roads that lies within the project’s

borders.

الباب الثالث

شبكات الطرق

Chapter 3 – Road Networks

*Study and design agreements includes several contracts before the implementation stages

289

Statistical Year Book

الدليل الإحصائي السنوي