A Detailed statement about the ongoing road projects Utility services lengths actually
executed during ( 2014/2015)
الباب الثالث
–
شبكات الطرق
Chapter 3 – Road Networks
New
roads
lengths
Re-
paving
roads
lengths
Utility services lengths (km)
Project name
water
telephones
electricity
drainage
of rain
water
sanitation
oil
planting
-
-
-
-
-
-
0.17
-
-
Roads and other services in the
coastline area (stage 2).
6.98
-
-
0.57
1.49
9.68
10.01
-
-
Roads and services for the
Central Region north of Sabhan.
-
-
-
-
-
6.71
5.64
-
-
The Infrastructure of the central
prison and the its expansion.
-
-
-
-
-
-
-
-
-
The implementation of temporary
flyovers at Al Nuwaisib road
(group 1).
-
-
-
-
-
-
-
-
-
The implementation of temporary
flyovers at Al Nuwaisib road
(group 2).
-
-
-
-
-
-
-
-
-
Roads and other services for the
Subiya highway (Stage 3).
-
-
-
-
-
-
-
-
-
Shaikh Jaber Al- Ahmad Al-
Sabah Bridge - main bridge –
Subyia link.
-
-
2.57
1.05
3.75
5.28
0.96
-
-
Al Jahra road development.
-
-
8.73
6.66
3.71
4.07
1.01
-
-
Roads and other services for
Jamal Abul Nasser street.
-
-
-
-
-
-
-
-
-
Intersections on the main
highways - the 6
th
Ring Road
that leads to Al Jahra residential
area .
15.3
-
9.15
4.67
6.15
8.16
-
0.2
6.3
Intersections on the main
highways the 6
th
and 7
th
Ring
Road that leads to the west of
Jeleeb AlShuyoukh residential
area .
-
-
-
-
-
-
-
-
-
Intersections on the main
highways - the 5
th
Ring Road &
King Faisal Rd that leads to the
south of AlSurra residential
area.
-
-
0.21
0.46
0.5
-
-
-
-
Intersections on the main
highways to serve Shaikh Jaber
Al- Ahmad city.
-
-
6.60
7.26
1.34
11.53
-
-
-
Intersections on the middle part
of Al Jahra road .
-
-
-
-
-
-
-
-
Intersections on the western part
of Jamal Abul Nasser street.
-
-
-
-
-
-
-
-
-
Shaikh Jaber Al- Ahmad Al-
Sabah Bridge – Al Doha link.
Highways
Interior roads
273
Statistical Year Book
الدليل الإحصائي السنوي




