A detailed statement about the ongoing road projects lengths ( internal – highway ) actually
executed during ( 2014/2015)
الباب الثالث
–
شبكات الطرق
Chapter 3 – Road Networks
Road
lining
lengths
concrete
barriers
lengths
No. of
road
signs
No. of
light
columns
*No. of
troughs
*No. of
Flyovers
Area
km²
Road lengths
Project name
Km.lane
km
internal roads
-
-
-
149
-
-
0.048
12
6
Roads and services for the Central
Region – north of Sabhan.
13
-
200
250
-
-
0.076
19
10
The Infrastructure of the central prison
and the its expansion.
-
-
-
-
-
4
0.004
2
0.59
The implementation of temporary
flyovers at Al Nuwaisib road (GP 1).
-
2.8
8
-
-
4
0.006
2
1
The implementation of temporary
flyovers at Al Nuwaisib road (GP 2).
highways
-
-
-
-
-
3
0.178
48
16
Roads and other services for the
Subiya highway (Stage 3).
-
-
-
-
1
1
0.514
139
35
Shaikh Jaber Al- Ahmad Al-Sabah
Bridge - main bridge – Subyia link.
3.991
5.167
2
89
1
12
0.562
152
38
Al Jahra road development.
-
-
-
5
-
3
0.163
44
11
Roads and other services for Jamal
Abul Nasser street.
52.09
0.56
91
7
-
5
0.27
73
24
Intersections on the main highways -
the 6
th
Ring Road that leads to Al
Jahra residential area .
44.216
6.672
114
135
1
4
0.047
11
3
Intersections on the main highways -
the 6
th
& 7
th
Ring Road that leads to the
west of Jeleeb Al-Shuyoukh residential
area .
-
-
-
-
-
-
0.004
1
1
Intersections on the main highways -
the 5
th
Ring Road & King Faisal Rd that
leads to the south of Al-Surra
residential area .
-
-
-
-
1
2
0.130
35
12
Intersections on the main highways to
serve Shaikh Jaber Al- Ahmad city.
-
7.908
-
43
-
3
0.281
76
19
Intersections on the middle part of Al
Jahra road .
-
-
-
-
-
3
-
-
-
Intersections on the western part of
Jamal Abul Nasser street.
-
-
-
-
-
1
0.019
3
0.4
Shaikh Jaber Al- Ahmad Al-Sabah
Bridge – Al Doha link .
176.99 km
Total road lengths for year( 2014/2015)
617 km . lane
* Total number during the project implementation period
271
Statistical Year Book
الدليل الإحصائي السنوي




