Background Image
Next Page  277 / 404 Previous Page
Information
Show Menu
Next Page 277 / 404 Previous Page
Page Background

A detailed statement about the ongoing road projects target lengths for year ( 2015/2016

)

الباب الثالث

شبكات الطرق

Chapter 3 – Road Networks

Road

lining

lengths

concrete

barriers

lengths

No.

of

road

signs

No. of

light

columns

*No. of

troughs

*No. of

Flyovers

Area

km²

Road lengths

Project name

Km.lane

km

internal roads

19

-

310

191

-

-

0.044

11

3

Roads and services for

the Central Region –

north of Sabhan

0.140

35

9

21

600

364

791

-

-

0.205

85

30

The Infrastructure of the

central prison and the its

expansion

-

-

-

-

-

-

0.011

3

1

roads and other services

in the coastline area

(stage 2)

8.3

2.5

20

16

-

4

0.037

8

3

The implementation of

temporary flyovers at Al

Nuwaisib road (Group 1)

-

2.8

16

28

-

4

0.023

7

3

The implementation of

temporary flyovers at Al

Nuwaisib road (Group 2)

Highways

-

-

-

-

1

1

0.28

76

19

Shaikh Jaber Al- Ahmad

Al-Sabah Bridge - main

bridge – Subyia link

126.101

20.2635

255

206

1

12

0.019

5

1

Al Jahra road

development

59.077

3.9

155

176

-

3

0.13

35

9

Roads and other services

for Jamal AbulNasser

street

20

5

30

46

1

2

0.211

57

19

Intersections on the main

highways to serve Shaikh

Jaber Al- Ahmad city

61.160

15.775

220

451

-

3

0.178

48

12

Intersections on the

middle part of Al Jahra

road

6.4

0.92

48

96

-

3

0.033

9

2

Intersections on the

western part of Jamal

AbulNasser street

-

-

-

-

-

-

-

-

-

Shaikh Jaber Al- Ahmad

Al-Sabah Bridge – Al

Doha link

111 km

Total road lengths for year ( 2015/2016 )

379 km/lane

* Total number during the project implementation period

277

Statistical Year Book

الدليل الإحصائي السنوي