A Detailed statement about the ongoing road projects Utility services lengths actually
executed during ( 2013/2014 )
الباب الثالث
–
شبكات الطرق
Chapter 3 – Road Networks
New
roads
lengths
Re-
paving
roads
lengths
Utility services lengths (km)
Project name
water
telephones
electricity
drainage
of rain
water
sanitation
oil
planting
-
-
3.5
2.7
4
2.3
-
-
-
the connected road between
the Custodian of the Two
Holy Mosques road and
Fahaheel Expressway.
-
-
-
-
0.2
2.3
-
-
Roads and services in Al
Fnaitees area (stage 1).
-
-
-
-
-
-
-
-
-
Roads and services in South
Subahiya area (Stage 4).
-
-
4.3
0.3
-
1.8
3.7
-
-
Roads and other services in
the coastline area (stage 2).
-
-
-
0.9
0.8
2.6
0.9
-
-
Roads and services for the
Central Region – north of
Sabhan.
-
-
15
8
1.5
19
7.6
-
-
The Infrastructure of the
central prison and the its
expansion.
-
-
-
0.8
0.2
-
-
1.6
-
Roads and other services for
the Subiya highway (Stage
3).
-
-
-
-
-
-
-
-
-
Shaikh Jaber Al- Ahmad Al-
Sabah Bridge - main bridge
– Subyia link.
-
-
13.8
1.4
9.1
-
-
-
-
Al Jahra road development.
-
-
20.2
4.3
42.8
3.3
2.8
-
-
Roads and other services for
Jamal AbulNasser street.
-
-
-
0.18
1.3
-
-
-
Intersections on the main
highways
the 6
th
Ring Road that leads
to Al Jahra residential area .
6.8
-
0.8
0.4
-
2.3
-
-
-
Intersections on the main
highways - the 6
th
and 7
th
Ring Road that leads to the
west of Jeleeb Al - Shuyoukh
residential area .
-
-
-
-
0.5
-
-
-
0.2
Intersections on the main
highways - the 5
th
Ring Road
& King Faisal Rd that leads
to the south of Al-Surra
residential area .
-
1.1
1.3
1.4
-
4.6
0.4
0.1
3.3
Intersections on the main
highways to serve Shaikh
Jaber Al- Ahmad city.
-
-
-
0.6
-
4.2
-
-
Intersections on the middle
part of Al Jahra road.
Highways
269
Statistical Year Book
الدليل الإحصائي السنوي




