A detailed statement about the ongoing road projects lengths ( internal – highway )
actually executed during ( 2013/2014 )
الباب الثالث
–
شبكات الطرق
Chapter 3 – Road Networks
Road
lining
lengths
concrete
barriers
lengths
No.
of
road
signs
No. of
light
columns
No. of
safety
lanes
No.
of
lanes
Road lengths
Project name
Km.lane
km
internal roads
8.245
-
10
21
-
3
9.78
3.26
the connected road between the
Custodian of the Two Holy Mosques road
and Fahaheel Expressway .
-
-
-
-
-
2
61.52
30.76
Roads and services in Al Fnaitees area
(stage 1).
-
-
-
-
-
2
4.26
2.13
Roads and services in South Subahiya
area (Stage 4).
16
-
168
269
-
2
34.9354
17.47
Roads and other services in the coastline
area (stage 2).
9.9
-
-
-
-
2
18.354
9.18
Roads and services for the Central
Region – north of Sabhan.
4
-
87
136
-
-
-
-
The Infrastructure of the central prison
and the its expansion.
highways
15.5
-
-
12
-
-
-
-
Roads and other services for the Subiya
highway (Stage 3).
-
-
-
-
-
-
-
-
Shaikh Jaber Al- Ahmad Al-Sabah Bridge
- main bridge – Subyia link.
-
-
-
-
-
-
-
-
Al Jahra road development.
-
-
-
-
-
-
-
-
Roads and other services for Jamal
AbulNasser street.
-
3.2
-
127
1
2
80.346
26.78
Intersections on the main highways - the
6
th
Ring Road that leads to Al Jahra
residential area.
-
2.5
-
31
-
-
-
-
Intersections on the main highways - the
6
th
& 7
th
Ring Road that leads to the west
of Jeleeb Al-Shuyoukh residential area.
4
6.59
24
-
-
-
-
-
Intersections on the main highways - the
5
th
Ring Road & King Faisal Rd that
leads to the south of Al-Surra residential
area.
-
4.04
170
164
-
-
-
-
Intersections on the main highways to
serve Shaikh Jaber Al- Ahmad city.
-
5.797
-
15
-
-
-
Intersections on the middle part of Al
Jahra road.
89.58 km
Total road lengths for year ( 2013/2014 )
209.1954 km . lane
267
Statistical Year Book
الدليل الإحصائي السنوي




