A detailed statement about the ongoing road projects lengths ( internal – highway )
actually executed during ( 2012/2013 )
الباب الثالث
–
شبكات الطرق
Chapter 3 – Road Networks
Area km²
Road lengths
Project name
Km . lane
km
internal roads
0.48
56
27
Roads and services for Al Mahboula district ( stage 1 ).
-
0.582 km
Airport road sewer with its intersection with the Fourth Ring Road
towards Jamal Abdul Naser road .
-
0.670 km
Muhamad Abdul Qassem street sewers with its intersection with
the Fourth Ring Road towards Jamal Abdul Nasser road.
-
4 km
Main sewer in Sheik/Jabir and Sheik/Saad cities .
0.16
20.791
5.249
Roads and services in South Subahiya area (Stage 4).
0.0319
6.96
1.16
the connected road between the Custodian of the Two Holy
Mosques road and Fahaheel Expressway .
0.069
8.68
4.14
Roads and services in Al Fnaitees area ( stage 1 ).
0.28
35
8.75
Roads and services for the Central Region – north of Sabhan.
0.8624
21.56
10.78
Roads and other services in the coastline area (stage 2).
Highways
1.35
183
30.5
The link road between Al wafraa and Kabd.
0.355
118.516
14.361
Roads and other services for the Subiya highway (Stage 3).
0.22
92.262
9.262
Intersections on the main highways - the 6
th
Ring Road that leads
to Al Jahra residential area .
0.2274
7
1.75
Intersections on the main highways - the 5
th
Ring Road & King
Faisal Rd that leads to the south of Al-Surra residential area .
-
549.769
112.952
Total road lengths for year ( 2012/2013 )
-
-
5.252
Total sewer lengths for year ( 2012/2013 )
265
Statistical Year Book
الدليل الإحصائي السنوي




