Study, design, and supervision of Kabd’s northern treatment plant’s

implementation and emergency line

The project aims to:

replace and treat sewage water with

a capacity of 425,000 m3/day, and is

expected to expand to up to 635,000

m3/day by the year 2028 because of

the emergence of new residential

areas

According to the structural scheme,

the station is expected to begin

operating in 2017

Current Status :

this projects will be transferred to

the Public-Private Partnership

(P.P.P

)

يهدف المشروع إلى

:

اساااتقبال

ومعالجاااة ميااااه الصااارف الصاااحي بطاقاااة

إستيعابية

(

425,000

(m³/day

ومال المتوقاع ول

تكااول قابلااة للتوسااع للاايااة

(

635,000

m³/day

)

بحلااول

) 8202 ( عااام

وذلااك بساابب دخااول مناااطق

سكنية جديدة

.

وبناااء علااى المخطااط الهيكلااي فجنااه ماال المتوقااع ول

تدخل المحطة حيز التشلايل في عام

( 2017 . )

الوضع الحالي

:

ساوف ياتم تحويال المشاروع إلاي هيئاة مشاروعات

الشراكة بيل القطاع العام والخاص

(

P.P.P ).

الوضع

الحالي

:

تم تأجيل الطرح

درادة

ً

ً

وتطوقر

و

ً

وتصؿقم

ً

اؾوػرة

ً

ؿزارع

ً

وخطوط

ً

اؾرى

ً

ذلؽة

ً

تـػقذ

(

ً

تصؿقم

ً

ؿـاؼصة

) وبـاء

Study and development, design and implementation of a network of irrigation lines

in Al-Wafra Farms (design &build tender), Postponing request is in process

ًً

Current Status

:

Presenting is delayed