The project aims to:

improve the sewerage network’s

efficiency for the areas of (Surra,

Yarmok, Qurtoba) by replacing the

corroded pipelines with new world-class,

anti-corrosion pipes, and replacing the

old manholes with new ones padded

with (G.R.P) material with improved and

increased diameters and tendencies, in

addition to the improvement of roads,

rainwater drainage network, streets

lighting, and telephone networks’

efficiency

Current Status:

Under the completion of the design

stage

يهدف المشروع إلى

:

تحساايل

كفاااءة شاابكة الصاارف الصااحي لمناااطق

(

السرة

ن اليرموك ن قرطبة

)

عل طريق إساتبدال

الخطااوط المتآكلااة بأنابيااب جدياادة ماال مااواد ذات

مواصااافات عالمياااة ومقاوماااة للتآكااال واساااتبدال

المناهيااال القديماااة باااأخر جديااادة مبطناااة بماااادة

(

G.R.P )

ماع تحسايل وزياادة المياول والأقطاار

بالإضافة إلى تحسيل كفاءة الطرق وشبكة صرف

الأمطار وإنارة الشوارع والهاتف

.

الوضع الحالي

:

قيد

الإنتهاء مل مرحلة التصميم

.

ً

ـارق

ً

اؾمومقة

ً

اؾلـقة

ً

أعؿال

ً

عؾى

ً

والإذراف

ً

وتصؿقم

ً

درادة

ً(

ً

ؼررلة

ً،ً

اؾيراؿوك

ً،ً

اؾيرة

ً)

ً

ا رحؾة

(

11

ً.ً)

Study, design, and supervision on the infrastructure works in the areas of

(Surra, Yarmouk, Qurtuba) – phase 11

ً

ادة در

ً

ً

أعؿال

ً

تـػقذ

ً

عؾى

ً

والإذراف

ً

وتصؿقم

ً

يين

ٍ ً

اؾلـقة

ً

اؾشقوخ

ً

جؾقب

ً

ـطؼة

ً

ا رحؾة

(

13

ً)

Agreement No. A / e, p / 83 study, design and supervision of infrastructure

improvement works for the area of Gleb Al-Shyokh- Phase (13)

The project aims to :

improve the sewerage network’s

efficiency for Jleb Al-Shyokh area by

replacing the corroded pipelines with

new world-class, anti-corrosion pipes,

and replacing the old manholes with new

ones padded with (GRP) material with

improved and increased diameters and

tendencies, in addition to the

improvement of roads, rainwater

drainage network, streets lighting, and

telephone networks’ efficiency. Also the

implementation of a main line on the

Sixth Ring road from South Sabhan to

Kabd station, passing by the Sheddadiya

pumping station

Current Status :

Under the completion of

the design stage

يهدف المشروع إلى

:

تحسيل

كفااءة شابكة الصارف الصاحي لمنطقاة

جليااب الشاايوخ عاال طريااق اسااتبدال الخطااوط

المتآكلة بأنابيب جديدة مل مواد ذات مواصفات

عالمياااة ومقاوماااة للتآكااال واساااتبدال المناهيااال

القديمة بأخر جديدة مبطناة بماادة

G.R.P)

)

مع تحسيل وزيادة المياول والأقطاار بالإضاافة

إلاااى تحسااايل كفااااءة الطااارق وشااابكة صااارف

الأمطااار وإنااارة الشااوارع والهاااتف بالإضااافة

إلى تنفيذ خط رئيسي على الدائر السادس مل

بمحطاة

جنوب صبحال إلى محطة كبد مارورا

. ضخ الشدادية

الوضع الحالي

:

قيد

الإنتهاء مل مرحلة التصميم

الهندسة الصحيــة

Sanitation projects

48