Background Image
Next Page  65 / 408 Previous Page
Information
Show Menu
Next Page 65 / 408 Previous Page
Page Background

Chapter 1

- Projects - Achievements

The Construction of the remote control and observation center of sanitary engineering of AL-Ardiya

treatment plant .

location: inside the water pumping station of AL - Ardiya in AL- Farwaniya governorate.

The total space of the location: 110.450 m².

The space of the Flat construction land: 9.925 m².

The space of the buildings' floors: 37.600 m².

The project of controlling and observation of the sanitation net is considered the first of its kind in the Middle East in

Kuwait . It is distinctive in its special geographic location. It takes place inside AL - Ardiya between the fifth ring

road and the sixth ring road. It is also distinctive in its sophisticated design in terms of architectural luxury and its

aesthetic view .

It is distinctive in its high level finishing works and its connection to all of the services. In addition to the wide green

planted areas which improve the environment of the neighboring area.

The purpose of the project :

connecting all of the treatment plants (of sewage water) to the remote controlling and observation system mainly in

Kuwait.

It services the actual treatment plants by connecting them to a central remote controlling and observation system.

The future treatment plants will be also connected to this system.

It consists of (4) buildings :

1-Controlling and observation central building.

2-Environment administration building .

3-Water purification sources administration building.

4- Central Services building.

It also consists of services work and external roads :

1-rain water drainage network .

2-Sanitation network.

3-water network.

4-external cable network.

5-Afforestation and planting around the building.

6-Roads inside the project.

7-a parking lot for 578 cars.

65

Statistical Year Book

الدليـــل الإحصــائــي الســـنوي