Background Image
Next Page  305 / 408 Previous Page
Information
Show Menu
Next Page 305 / 408 Previous Page
Page Background

Chapter 3

– Road Networks –

A detailed statement about the target road lengths of the ongoing road projects (internal - highway)

for ( 2016/2017) till ( 2019/2020 )

Target road lengths

2016/2017

2017/2018

2018/2019

2019/2020

Project name

km

Km. lane

km

Km. lane

km

Km. lane

km

Km. lane

Internal roads

The Infrastructure of the

central prison and the its

expansion.

5.88

11.78

-

-

-

-

-

-

Implementation of

temporary flyovers at Al

Nuwaisib road (group 1).

3.846

7.692

-

-

-

-

-

-

Highways

Shaikh Jaber Al- Ahmad

Al-Sabah Bridge - main

bridge – Subyia link.

43.26

164.94

51.7

171.26

9.32

22.22

-

-

Al Jahra road

development.

50.43

137.51

-

-

-

-

-

-

Roads and services for

Jamal Abul Nasser street.

17.6

75.3

12.2

58.47

-

-

-

-

Intersections on the

highways to serve Shaikh

Jaber Al- Ahmad city.

13.33

40

3

9

-

-

-

-

Intersections on the

middle part of Al Jahra

road .

0.46

1.8

-

-

-

-

-

-

Intersections on the

western part of Jamal

Abul Nasser street.

2.27

20.45

6.505

119.2

-

-

-

-

Shaikh Jaber Al- Ahmad

Al-Sabah Bridge – Al

Doha link .

-

-

13.514

54.056

25.622

102.488

-

-

Roads and flyovers for the

1

st

ring road group 2.

0.412

2.785

2.151

14.54

2.545

18.865

-

-

Roads and other services

for the linking road

between Abdullah port

and Al Wafra.

28.2

100.6

12

40

-

-

-

-

linking road between

Sabah Al-Ahmad City and

Al khiran residential city.

4.8

14.4

60.6

181

38.66

126.58

-

-

Intersections on the

western part of the 5

th

ring road.

5.5

14

11.6

21

42.7

115.4

2.5

3.7

Flyover and other

services on the Arabian

Gulf Street at Al Badaa

roundabout.

1.262

2.588

2.562

5.254

-

-

-

-

Target road

lengths

177.25

593.845

175.832

673.78

118.847

385.553

2.5

3.7

305

Statistical Year Book

الدليـــل الإحصــائــي الســـنوي