Chapter 3
– Road Networks –
A detailed statement about the target road lengths of the ongoing road projects (internal - highway)
for ( 2016/2017) till ( 2019/2020 )
Target road lengths
2016/2017
2017/2018
2018/2019
2019/2020
Project name
km
Km. lane
km
Km. lane
km
Km. lane
km
Km. lane
Internal roads
The Infrastructure of the
central prison and the its
expansion.
5.88
11.78
-
-
-
-
-
-
Implementation of
temporary flyovers at Al
Nuwaisib road (group 1).
3.846
7.692
-
-
-
-
-
-
Highways
Shaikh Jaber Al- Ahmad
Al-Sabah Bridge - main
bridge – Subyia link.
43.26
164.94
51.7
171.26
9.32
22.22
-
-
Al Jahra road
development.
50.43
137.51
-
-
-
-
-
-
Roads and services for
Jamal Abul Nasser street.
17.6
75.3
12.2
58.47
-
-
-
-
Intersections on the
highways to serve Shaikh
Jaber Al- Ahmad city.
13.33
40
3
9
-
-
-
-
Intersections on the
middle part of Al Jahra
road .
0.46
1.8
-
-
-
-
-
-
Intersections on the
western part of Jamal
Abul Nasser street.
2.27
20.45
6.505
119.2
-
-
-
-
Shaikh Jaber Al- Ahmad
Al-Sabah Bridge – Al
Doha link .
-
-
13.514
54.056
25.622
102.488
-
-
Roads and flyovers for the
1
st
ring road group 2.
0.412
2.785
2.151
14.54
2.545
18.865
-
-
Roads and other services
for the linking road
between Abdullah port
and Al Wafra.
28.2
100.6
12
40
-
-
-
-
linking road between
Sabah Al-Ahmad City and
Al khiran residential city.
4.8
14.4
60.6
181
38.66
126.58
-
-
Intersections on the
western part of the 5
th
ring road.
5.5
14
11.6
21
42.7
115.4
2.5
3.7
Flyover and other
services on the Arabian
Gulf Street at Al Badaa
roundabout.
1.262
2.588
2.562
5.254
-
-
-
-
Target road
lengths
177.25
593.845
175.832
673.78
118.847
385.553
2.5
3.7
305
Statistical Year Book
الدليـــل الإحصــائــي الســـنوي




