-The Coordination and Follow Up Sector:
Undertaking the coordination and follow-up tasks with
relation to the letters, decisions, and referrals that are outgoing from and ingoing to the Ministry, in
addition to preparing periodical reports on the levels of accomplishment, the obstacles, and the defects
in implementation.
-The Sanitary Engineering Sector:
undertakes preparing designs, supervising the implementation of
sanitary drainage networks, and pumping and lifting stations. In addition, it undertakes the operation
and maintenance of the wastewater treatment plants, irrigation stations, and their structures. It also
coordinates with the Kuwait Municipality and the competent entities to take over the sites and ensures
that they are free of debris and other obstacles before starting the implementation. Moreover, it
supervises the periodic and emergency maintenance of the facilities and buildings of the treated
wastewater network, ensuring their suitability for work.
-The Maintenance Engineering Affairs Sector:
undertakes inspecting the non-highway networks,
rainwater and sanitary drainage networks to propose the necessary maintenance work. It also oversees
the implementation of related maintenance contracts, and follows-up on the received complaints. The
sector undertakes following-up on the workflow in various maintenance contracts. It issues the licenses
related to connecting buildings to the sanitary drainage network, and ensures the implementation of
security and safety rules on sites with regards to development in coordination with the competent
entities. In addition, it operates and maintains all specialized equipment and machinery of the
Maintenance Engineering Sector such as suction equipment, mobile power generating equipment,
mobile pumps, and compressors, etc.
-The Road Engineering Affairs Sector:
undertakes preparing designs and supervising the
implementation of roads, services, and bridges and the maintenance of highways and bridges. It also
prepares the periodic and final evaluation of the performance level of contractors of implemented work,
and notifies the Planning and Follow-up Office with the evaluation results. In addition, it Follows-up
project workflows and compares them to the approved schedules, and prepares the related periodic
reports. The sector is responsible for coordinating with the competent entities in solving project-
designing issues during the implementation phases. Furthermore, it prepares the different engineering
designs and studies for rainwater drainage networks, sewerage, and rainwater channel dams. It also
evaluates the existing bridges and suggests the necessary repairs or enhancements in coordination
with the competent entities.
-The Construction-Project Engineering Sector:
undertakes studying and planning special projects,
and following-up the designing phases with local and international engineering offices entrusted to
project designing and supervision. It also undertakes the accomplishment of public buildings including
schools, mosques, clinics, suburb centers, etc. In addition, it lists the implemented work, and
undertakes the inventory and assessment of tools, equipment, and material in the case of withdrawal of
work from a contractor or work suspension due to the contractor negligence. Moreover, it follows-up
the work implementation of the agreements with the consulting engineering offices, and ensures that
the consultants fulfill all their obligations according to the agreement terms and are abided by the
followed standards in designing during the designing phase. Furthermore, the Sector reviews and
Audits the designs, plans, specifications, and amount tables for electricity, air-conditioning, sanitation,
fire alarm system, elevators, communication system, and other works prepared by the consulting
engineering offices for project affiliated to the Design departments.