Background Image
Previous Page  173 / 404 Next Page
Information
Show Menu
Previous Page 173 / 404 Next Page
Page Background

A Statement about the future Sanitary Projects

Consultative agreements

Projects that have been presented and in the process of tendering

Study, design and implementation and maintenance of a main line of quad-treated water from (DMC)

to Sabah Al-Salem University City.

The Department of Mishrif pumping station operation and maintenance, and its other utilities.

Projects in preparation for presenting

Construction and completion of the main wastewater line from Al Surra to ALRiggai areas.

Consulting Agreement for phase (15) study, design and supervision of the implementation of

infrastructure for (Andalus – Girnata - Sabah Al-Nasser) areas.

The Implementation of Kuwait’s infrastructure, stage 15 , Al Andalus area.

Implementation of Kuwait’s infrastructure, stage 15, Girnata and Sabah Al-Nasser areas.

Construction, completion, maintenance of TSE Lines from DMC to Al Wafra pump station – project

Area D3.

Construction, operation and maintenance of TSE Network and reservoirs for project Area D1.

Supply, installation, operation and maintenance of flow measurement devices in different areas of the

State of Kuwait.

Study and development, design and implementation of the irrigation network in Wafra’s farms lines.

Projects under the design phase

Study, design and supervision of the implementation of infrastructure for (Al-Surra - Qurtuba -

Yarmouk) and the main line connecting between the Al-Surra and the pumping station A7 in Al-Raqa'i.

Study, design and supervision of the implementation of the Shedadiya pumping station and its

affiliated lines.

Projects under study

study ,design and rehabilitation of Al Wafra residential area (pump station, treatment plants) and

improvement of treated effluent storage tanks with TSE network in different area of Kuwait.

study ,design and construction supervision of rehabilitation and improvement of infrastructure in

Kuwait city.

Study, design and construction supervision of the , treatment plants and emergency line for Northern

Kabd area .

Study, implementation and supervision of the works to develop the main lines, tanks and irrigation

networks of (Al Ardiya – Eshbeliya – Al Rabya) areas.

الباب الأول

المشاريع

Chapter 1 - Projects

الدليل الإحصائي السنوي

Statistical Year Book

173

3-

أهم المشاريع المستقبلية

The most important

Future projects