Chapter 3
– Road Networks –
A Detailed statement about the ongoing road projects Utility services lengths actually
executed during ( 2014/2015 )
* Total number during the project implementation period
New
roads
lengths
Re-
paving
roads
lengths
Utility services lengths (km)
Project name
water
telephones
electricity
drainage
of rain
water
sanitation
oil
irrigation
Internal roads
-
-
-
-
-
-
0.17
-
-
Roads and services in the
coastline area (stage 2).
6.98
-
-
0.57
1.49
9.68
10.01
-
-
Roads and services for the
Central Region north of
Sabhan.
-
-
-
-
-
6.71
5.64
-
-
The Infrastructure of the
central prison and the its
expansion.
-
-
-
-
-
-
-
-
-
The implementation of
temporary flyovers at Al
Nuwaisib road (group 1).
-
-
-
-
-
-
-
-
-
The implementation of
temporary flyovers at Al
Nuwaisib road (group 2).
Highways
-
-
-
-
-
-
-
-
-
Roads and services for the
Subiya highway (Stage 3).
-
-
-
-
-
-
-
-
-
Shaikh Jaber Al- Ahmad
Al-Sabah Bridge - main
bridge – Subyia link.
-
-
2.57
1.05
3.75
5.28
0.96
-
-
AlJahra road development.
-
-
8.73
6.66
3.71
4.07
1.01
-
-
Roads and services for
Jamal Abul Nasser street.
-
-
-
-
-
-
-
-
-
Intersections on the main
highways - the 6
th
Ring
Road that leads to Al Jahra
residential area .
15.3
-
9.15
4.67
6.15
8.16
-
0.2
6.3
Intersections on the main
highways the 6
th
and 7
th
Ring Road that leads to the
west of Jeleeb AlShuyoukh
residential area .
-
-
-
-
-
-
-
-
-
Intersections on the main
highways - the 5
th
Ring
Road and King Faisal Rd
that leads to the south of
AlSurra residential area.
-
-
0.21
0.46
0.5
-
-
-
-
Intersections on the main
highways to serve Shaikh
Jaber Al- Ahmad city.
-
-
6.60
7.26
1.34
11.53
-
-
-
Intersections on the middle
part of Al Jahra road .
-
-
-
-
-
-
-
-
Intersections
on
the
western part of Jamal Abul
Nasser street.
-
-
-
-
-
-
-
-
-
Shaikh Jaber Al- Ahmad
Al-Sabah Bridge – Al
Doha link.
297
Statistical Year Book
الدليـــل الإحصــائــي الســـنوي




