Background Image
Next Page  295 / 408 Previous Page
Information
Show Menu
Next Page 295 / 408 Previous Page
Page Background

Chapter 3

– Road Networks –

A detailed statement about the ongoing road projects lengths ( internal – highway ) actually executed

during ( 2014/2015 )

Road

lining

lengths

concrete

barriers

lengths

No. of

road

signs

No. of

light

columns

*No. of

troughs

*No. of

Flyovers

Area

km²

Road lengths

Project name

Km.lane

km

Internal roads

-

-

-

149

-

-

0.048

12

6

Roads and services for the

Central Region – north of Sabhan.

13

-

200

250

-

-

0.076

19

10

The Infrastructure of the central

prison and the its expansion.

-

-

-

-

-

4

0.004

2

0.59

The implementation of temporary

flyovers at AlNuwaisib road (group

1).

-

2.8

8

-

-

4

0.006

2

1

The implementation of temporary

flyovers at AlNuwaisib road (group

2).

Highways

-

-

-

-

-

3

0.178

48

16

Roads and other services for the

Subiya highway (Stage 3).

-

-

-

-

1

1

0.514

139

35

Shaikh Jaber Al- Ahmad Al-Sabah

Bridge - main bridge – Subyia link.

3.991

5.167

2

89

1

12

0.562

152

38

Al Jahra road development.

-

-

-

5

-

3

0.163

44

11

Roads and services for Jamal

Abul Nasser street.

52.09

0.56

91

7

-

5

0.27

73

24

Intersections

on

the

main

highways - the 6

th

Ring Road that

leads to Al Jahra residential area

.

44.216

6.672

114

135

1

4

0.047

11

3

Intersections on the highways -

the 6

th

& 7

th

Ring Road that leads

to the west of Jeleeb Al-Shuyoukh

residential area .

-

-

-

-

-

-

0.004

1

1

Intersections on the highways -

the 5

th

Ring Road & King Faisal

Rd that leads to the south of Al-

Surra residential area .

-

-

-

-

1

2

0.130

35

12

Intersections on the highways to

serve Shaikh Jaber Al- Ahmad

city.

-

7.908

-

43

-

3

0.281

76

19

Intersections on the middle part of

Al Jahra road .

-

-

-

-

-

3

-

-

-

Intersections on the western part

of Jamal Abul Nasser street.

-

-

-

-

-

1

0.019

3

0.4

Shaikh Jaber Al- Ahmad Al-Sabah

Bridge – Al Doha link .

176.99 km

Total road lengths for year ( 2014/2015)

617 km . lane

* Total number during the project implementation period

295

Statistical Year Book

الدليـــل الإحصــائــي الســـنوي