Background Image
Next Page  279 / 404 Previous Page
Information
Show Menu
Next Page 279 / 404 Previous Page
Page Background

A Detailed statement about the ongoing road projects Utility services target lengths for

year ( 2015/2016)

الباب الثالث

شبكات الطرق

Chapter 3 – Road Networks

New

roads

lengths

Re-

paving

roads

lengths

Utility services lengths (km)

Project name

water

telephones

electricity

drainag

e of rain

water

sanitation

oil

planting

-

-

2.98

2.8

-

0.3

0.3

-

-

Roads and services

for the Central

Region – north of

Sabhan

-

-

-

3.6

0.68

1

0.15

-

-

The Infrastructure of

the central prison and

the its expansion

-

-

42

16

-

22

12

-

-

roads and other

services in the

coastline area stage

2

-

-

-

-

-

-

-

-

-

The implementation

of temporary flyovers

at Al Nuwaisib road

(Group 1)

-

-

0.15

0.08

0.1

2

-

-

-

The implementation

of temporary flyovers

at Al Nuwaisib road

(Group 2)

7.43

-

-

-

-

-

-

-

-

Shaikh Jaber Al-

Ahmad Al-Sabah

Bridge - main bridge

– Subyia link

-

-

3.88

1.84

7.03

12.37

3.51

-

5

Al Jahra road

development

8.4

-

10.1

7.19

28.4

12.95

2.33

-

5.68

Roads and other

services for Jamal

AbulNasser street

-

1.7

10.6

7.81

1.3

10

1.21

0.01

5.43

Intersections on the

main highways to

serve Shaikh Jaber

Al- Ahmad city

-

-

15.12

16.05

1.67

27.06

-

-

-

Intersections on the

middle part of Al

Jahra road

9.12

-

0.43

2.2

4.7

4.57

0.2

0.6

0.48

Intersections on the

western part of Jamal

AbulNasser street

-

-

-

-

-

-

-

-

-

Shaikh Jaber Al-

Ahmad Al-Sabah

Bridge – Al Doha link

Highways

Interior roads

279

Statistical Year Book

الدليل الإحصائي السنوي