A detailed statement about the ongoing road projects target lengths for year ( 2015/2016
)
الباب الثالث
–
شبكات الطرق
Chapter 3 – Road Networks
Road
lining
lengths
concrete
barriers
lengths
No.
of
road
signs
No. of
light
columns
*No. of
troughs
*No. of
Flyovers
Area
km²
Road lengths
Project name
Km.lane
km
internal roads
19
-
310
191
-
-
0.044
11
3
Roads and services for
the Central Region –
north of Sabhan
0.140
35
9
21
600
364
791
-
-
0.205
85
30
The Infrastructure of the
central prison and the its
expansion
-
-
-
-
-
-
0.011
3
1
roads and other services
in the coastline area
(stage 2)
8.3
2.5
20
16
-
4
0.037
8
3
The implementation of
temporary flyovers at Al
Nuwaisib road (Group 1)
-
2.8
16
28
-
4
0.023
7
3
The implementation of
temporary flyovers at Al
Nuwaisib road (Group 2)
Highways
-
-
-
-
1
1
0.28
76
19
Shaikh Jaber Al- Ahmad
Al-Sabah Bridge - main
bridge – Subyia link
126.101
20.2635
255
206
1
12
0.019
5
1
Al Jahra road
development
59.077
3.9
155
176
-
3
0.13
35
9
Roads and other services
for Jamal AbulNasser
street
20
5
30
46
1
2
0.211
57
19
Intersections on the main
highways to serve Shaikh
Jaber Al- Ahmad city
61.160
15.775
220
451
-
3
0.178
48
12
Intersections on the
middle part of Al Jahra
road
6.4
0.92
48
96
-
3
0.033
9
2
Intersections on the
western part of Jamal
AbulNasser street
-
-
-
-
-
-
-
-
-
Shaikh Jaber Al- Ahmad
Al-Sabah Bridge – Al
Doha link
111 km
Total road lengths for year ( 2015/2016 )
379 km/lane
* Total number during the project implementation period
277
Statistical Year Book
الدليل الإحصائي السنوي




