Follow / A detailed statement about the most important works completed within the road
maintenance projects (contracts) during 2014
6- video recording works to the sewage and storm water drainage networks
Works description
location
Creating new sewage network and storm water drainage network inside Al Somod camp, done in 2
stages.
Constructing sewage line by Micro tunnel way to Al Somod camp.
Cleaning and vedio recording works in several areas (industrial Al Shwikh, residential Al Shwikh, Al
khaldia, Ghernata, Al Shamya).
Creating link to connect the sewer pipes of building 6 block 6 in Kuwait city and the sewer pipe of
the ministry.
Kuwait city
(the capital)
Cleaning and Video recording in several areas (Hawalli, Hawalli square, Al Salmya, Al Rumaithya,
Salwa, Mushrif, Al shohdaa, Al zahraa).
Construction houses connections to Al shaab Al Bahary.
Construction lines to several areas (Al Rumaithya block 5&6, the medical center in Mubarak Al
Abdallah area, Al Sedeeq area block 3, Al Salmya block 1, Al Slam block 7, Al Zahraa block 2,
Bayan block 1).
Hawalli
Cleaning the storm water drainage in Al Farwaniya governorate.
Cleaning and Video recording in several areas (Eshbilya, Alrabia, Alrehab, west Algleeb, Khaitan,
Gleeb Alshyukh, Al Farwaniya , Alomaria, industrial Al Ardia and the stores, Al Reggai, Al Andalus)
Connect the buildings to the main network in Alfrwania block 5.
Al
farwaniya
Cleaning sewage lines in several areas (Alfuntas, east AL Ahmadi, Alsabheya, Aleqela, Subah Al
Ahmad marine city, Um Al haiman, Al Faheheel, Al Manqaf, Jaber Al Ali)
Construction lines in two sites (Al Manqaf block 4, Al Mahboola the coastal road at the restaurants
complex).
Al Ahmadi
Construction sewage line by undergrounds digging way starts from Abo Fattiera to Alhassania
Cleaning and Video recording in several areas (Subah Alsalem, Residential Almessila)
Cleaning the storm water network in several areas (Aladan, Alqsoor, Mubarak Alkbeer, Alqreen,
Sabhan).
Mubarak Al
kabeer
Cleaning and Video recording in Al Eyoon.
Construction storm water drainage line in the sand corridor in Al Qasr block 4.
Al Jahraa
الباب الثاني
–
بيانات إحصائية
Chapter 2 – Statistical Data
Kuwait city
(the capital)
Completion the public post office – Fahd Al Alem street.
The concrete structure maintenance works and barking building – National Assembly.
Maintenance works and preparations to Ramadan in the Kuwait grand mosque.
Hawalli
Al Salmiya theater.
Completion the works of Bait Al Othman.
Al farwaniya
Al Reqqai pump station A7.
Al Ahmadi
Souq Sharq Al Ahmadi.
Al Jahraa
Restoration works in the red palace.
Mubarak Al
kabeer
Maintenance works in the department of maintenance the buildings in Mubarak Al kbeer.
Maintenance works to the highways department building.
A detailed statement about the most important achievements to buildings
maintenance contracts during 2014