Construct, complete and maintenance roads and
intersections in the southern region from north
Abdullah port – Al-Wafra to North Kabd
The project aims to:
To face the increasing traffic density due to urban
development and population growth in these areas and
raise the absorptive capacity and reduce traffic
congestion and raise the level of services
Total length: 29km
Regional road – southern part (Phase 1)
Total length: 127km
No. of intersections: 14
No. of passageways that are intersecting with the
highway bridges: 22
No. of passageways that are intersecting with the
GCC’’s railway bridges: 3
Camels crossings: 2
Total length: 29km
The current status:
Preparing for presenting..
ُ
مشروع إ
ُ
يهدف ا
:
ا
ُ
ساريع إ
ُ
فحيحيال ا
ُ
طرياق ا
َ
ربط باي
ُ
ا
طقاة
ُ
م
ي
ُ
كبد بطول حوا
( 21.8
كم
)
ويشمل عدد
7
طريااق
ُ
مشااروع تطااوير ا
ُ
تقاطعااات وشاامل ا
مروريا
ُ
حركاة ا
ُ
تصابح ا
ُ
ساابع
ُ
ادائري ا
ُ
ا
ُ
ة عليا
سارع
ُ
أية إشارات مرورية وا
َ
حركة حره بدو
ة
تصابح
ُ ُ
مسموحة علي
ُ
ا
80
ا
ُ
كام إ
120
كام
/
َ
ساعة بدلاً م
60
كم
/
ساعة
.
طريق بعدد
ُ
تم تصميم ا
6
حارات
–3
حارات
بكل جهة مع إ اافة حاارة رابعاة فاي كال
إتجا
اه
مساااتقبلية ماااع تاااوفير خدماااة
ُ
لتوساااعة ا
ُ
ُ
إ
تظاااار
مشاة
ُ
ات وجسور ا
ُ
شاح
ُ
ا
.
الوض الحالي
:
تمت
ترسية
ُ
ا
لتوقيع
ُ
تجهيز
ُ
و جاري ا
.
تطوير وتنفيذ وصيانة الدائر الساب مر الطريد الساحلي حدود النويصيب وحتي الش
دادية
(
طريد
الساب المرحلة الأولي
)
Develop, execute and maintenance 7th ring road from
the coastal road in Al-Nuwaiseeb road to Al-Shedadiya
(7thring road)-( First stage)
The project aims to:
Connecting the Fahaheel highway with Kabd area
by a length of approximately 21,8km. Includes 7
intersections The project contains the development
of the Seventh Ring road in order to turn its
traffic into a free traffic movement without any
traffic signals, and change the allowed speed to 80
– 120 km / h instead of 60 km / h, with all the
infrastructure and landscaping services with the
trees belt along each direction
The road has been designed with 6 lanes – 3
lanes per direction, in addition to taking in
consideration the addition of a 4th lane in each
direction for future expansion with providing truck
waiting services and pedestrians bridges
The current status :
Presented, and preparing for signing
ُ
مشروع إ
ُ
يهدف ا
:
لتطاا
ُ ً
ظاارا
ُ
مروريااة
ُ
كثافااة ا
ُ
مواجهااة تزايااد ا
ور
اطق
ُ
م
ُ
ية في هذه ا
ُ
سكا
ُ
زيادة ا
ُ
ي وا
ُ
عمرا
ُ
ا
ورفاع
قدرة
ُ
ا
الأستعابية
وتقليل
الإزدحام
مرور
ُ
ا
ي ورفاع
خدمات
ُ
مستوي ا
.
ي
ُ
طول الإجما
ُ
ا
29
كم
.
طريااق الإقليمااي
ُ
ا
–
ااوبي
ُ
ج
ُ
جااازء ا
ُ
ا
(
مرحلااا
ُ
ا
ة
ُ
الأو
. )
ي
ُ
طول الإجما
ُ
ا
: 127
كم
.
تقاطعات
ُ
عدد ا
:14 .
طااارق
ُ
متقاطعاااة ماااع جساااور ا
ُ
عباااارات ا
ُ
عااادد ا
سريعة
ُ
ا
:22 .
ح
ُ
سكة ا
ُ
متقاطعة مع جسور ا
ُ
عبارات ا
ُ
عدد ا
ديدية
خليجي
ُ
ا
َ
تعاو
ُ
دول مجلس ا
ُ
:3 .
جمال
ُ
معابر ا
:2 .
ي
ُ
طول الإجما
ُ
ا
:29
كم
.
الوض الحالي
:
جاري
تجهيز
ُ
ا
لطرح
ُ
.
26