Background Image
Next Page  46 / 90 Previous Page
Information
Show Menu
Next Page 46 / 90 Previous Page
Page Background

إ

نشاء و

إ

نجاز وصيانة الطر والتقاطعات على الإ

قليمي

الجنوبي منشمال

طريلأ ميناء عبدالله

الوفرة

لىإ

شمال كبد

Construct, complete and maintenance roads and intersections in the

southern region from north Abdullah port – Al-Wafra to North Kabd

The project aims to:

To face the increasing traffic density due to urban

development and population growth in these areas and

raise the absorptive capacity and reduce traffic

congestion and raise the level of services

Total length: 29km

Regional road – southern part (Phase 1)

Total length: 127km

No. of intersections: 14

No. of passageways that are intersecting with the

highway bridges: 22

No. of passageways that are intersecting with the

GCC’’s railway bridges: 3

Camels crossings: 2

Total length: 29km

The current status:

Underway for design and preparing for presenting..

يهدف المشروع إلى

:

الرب بي طريق الفحيحيـل السـريع إلـ

ى

منطقـة كبـد بطـوث حـوالي

( 21.8

) كـم

ويشـــمل عـــدد

7

تقاطعـــات وشـــمل

المشروع تطوير الطريق الدائري السـاب

ع

لتصبح الحركة المرورية عليث حركة حره

بــدوا أيــة إشــارات مروريــة والســرعة

المسموحة عليث لتصبح

80

كم إلـى

120

/كم

م

ً

ساعة بدلا

/كم06

. ساعة

تـم تصـميم الطريـق بعـدد

6

3– حـارات

حارات بكل جهة مع إضـافة حـارة رابعـة

في كل

إتجاه

للتوسعة المسـتقبلية مـ

ع

توفير خدمة

إنتظار

الشـاحنات وجسـور

المشاة

.

الوضع الحالي

:

تم

الترسية

و جاري التجهيز للتوقيع

.

تطوير وتنفيذ وصيانة الدائر السابع من الطريلأ الساحلىحدود النويصي

ب وحتى

الشدادية

(

طريلأ السابع المرحلة الأولى

)

Develop, execute and maintenance 7th ring road from the coastal road in Al-

Nuwaiseeb road to Al-Shedadiya (7thring road)-( First stage)

The project aims to:

Connecting the Fahaheel highway with Kabd area

by a length of approximately 21,8km. Includes 7

intersections The project contains the development

of the Seventh Ring road in order to turn its

traffic into a free traffic movement without any

traffic signals, and change the allowed speed to 80

– 120 km / h instead of 60 km / h, with all the

infrastructure and landscaping services with the

trees belt along each direction

The road has been designed with 6 lanes – 3

lanes per direction, in addition to taking in

consideration the addition of a 4th lane in each

direction for future expansion with providing truck

waiting services and pedestrians bridges

The current status :

Presented, and preparing for signing

يهدف المشروع إلى

:

ً

مواجهــة تزايــد الكاافــة المروريــة نظــرا

للتطور العمرانـي والزيـادة السـكانية فـي

هـذه المنـاطق ورفـع القـدرة

الأسـتعابية

وتقليل

الإزدحـاب

المـروري ورفـع مسـتوي

الخدمات

.

الطوث الإجمالي

. كم 92

الطريـــق الإقليمـــي

الجـــزء الجنـــوبي

(

المرحلة الأولى

. )

الطوث الإجمالي

. كم 721 :

عدد التقاطعات

:14 .

عدد العبارات المتقاطعة مع جسور الطرق

السريعة

:22 .

عــدد العبــارات المتقاطعــة مــع جســور

السـكة الحديديـة لـدوث مجلـس التعـاوا

الخليجي

:3 .

معابر الجماث

:2 .

الطوث الإجمالي

. كم 92:

الوضع الحالي

:

جاري التصميم والتجهيز للطرح

.

مشـاريع الطــــــــــر

Road project

APL2016

أبريل

2016

FUTuER PROJECT

ا

لمشاريـــــــــع المستقبلية

26