Construct, complete and maintenance roads and intersections in the

southern region from north Abdullah port – Al-Wafra to North Kabd

The project aims to:

To face the increasing traffic density

due to urban development and

population growth in these areas and

raise the absorptive capacity and

reduce traffic congestion and raise the

level of services

Total length: 29km

Regional road – southern part (Phase

1)

Total length: 127km

No. of intersections: 14

No. of passageways that are

intersecting with the highway bridges:

22

No. of passageways that are

intersecting with the GCC’’s railway

bridges: 3

Camels crossings: 2

Total length: 29km

The current status:

Underway for design and preparing for

presenting..

يهدف المشروع إلى

:

الربط بين طريق الفحيحيل السريع إل

ى منطقة

كبد بطول حوالي

) كم 8.12 (

ويشمل عذدد

7

تقاطعذات وشذمل المشذروع تطذوير الطريذق

الدائرة السابع لتصبح الحركة المروري

ة عليه

حركذذذة حذذذره بذذذدون يذذذة إشذذذارات مروريذذذة

والسرعة المسموحة عليذه لتصذبح

80

كذم إلذى

/كم 021

من

ساعة بد

/كم 06

. ساعة

تذذذم تصذذذميم الطريذذذق بعذذذدد

6

3– حذذذارات

حارات بكل جهة مع إضذافة حذارة رابعذة فذي

كل

إتجاه

للتوسعة المستقبلية مع توف

ير خدمذة

إنتظار

الشاحنات وجسور المشاة

.

الوضع

الحالي

:

تم

الطرح وجارة

الترسية

.

تطوير وتنفيذ وصيانة الدائري السابع من الطريق الساحلى حدود النويصيب و

حتى الشدادية

(

طريق السابع المرحلة الأولى

)

Develop, execute and maintenance 7th ring road from the coastal road in Al-

Nuwaiseeb road to Al-Shedadiya (7thring road)-( First stage)

The project aims to:

Connecting the Fahaheel highway with

Kabd area by a length of approximately

21,8km. Includes 7 intersections The

project contains the development of the

Seventh Ring road in order to turn its

traffic into a free traffic movement

without any traffic signals, and change

the allowed speed to 80 – 120 km / h

instead of 60 km / h, with all the

infrastructure and landscaping services

with the trees belt along each direction

The road has been designed with 6

lanes – 3 lanes per direction, in addition

to taking in consideration the addition of

a 4

th

lane in each direction for future

expansion with providing truck waiting

services and pedestrians bridges

The current status :

It has been presenting and underway

awarding.

يهدف المشروع إلى

:

مواجهذذذة تزايذذذد الكثافذذذة المروريذذذة نظذذذرا

للتطور العمراني والزيادة السكانية ف

ي هذ ه

المنذذاطق ورفذذع القذذدرة

اوسذذتعابية

ليذذل وتق

الإزدحذذذذذذام

المذذذذذذرورة ورفذذذذذذع مسذذذذذذتوة

الخدمات

.

الطول الإجمالي

. كم 92

الطريذذذذذق الإقليمذذذذذي

الجذذذذذزء الجنذذذذذوبي

(

المرحلة اوولى

. )

الطول الإجمالي

. كم 721 :

عدد التقاطعات

:14 .

عدد العبارات المتقاطعة مع جسور الطذرق

السريعة

:22 .

عدد العبارات المتقاطعة مذع جسذور السذك

ة

الحديدية لدول مجلس التعاون الخليجي

:3 .

معابر الجمال

:2 .

الطول الإجمالي

. كم 92:

الوضع

الحالي

:

جارة التصميم والتجهيز للطرح

.

مشـاريعالطـ

ـــــــــ

رق

Roadprojects