Construct, complete and maintenance roads and intersections in the
southern region from north Abdullah port – Al-Wafra to North Kabd
The project aims to:
To face the increasing traffic density
due to urban development and
population growth in these areas and
raise the absorptive capacity and
reduce traffic congestion and raise the
level of services
Total length: 29km
Regional road – southern part (Phase
1)
Total length: 127km
No. of intersections: 14
No. of passageways that are
intersecting with the highway bridges:
22
No. of passageways that are
intersecting with the GCC’’s railway
bridges: 3
Camels crossings: 2
Total length: 29km
The current status:
Underway for design and preparing for
presenting..
يهدف المشروع إلى
:
الربط بين طريق الفحيحيل السريع إل
ى منطقة
كبد بطول حوالي
) كم 8.12 (
ويشمل عذدد
7
تقاطعذات وشذمل المشذروع تطذوير الطريذق
الدائرة السابع لتصبح الحركة المروري
ة عليه
حركذذذة حذذذره بذذذدون يذذذة إشذذذارات مروريذذذة
والسرعة المسموحة عليذه لتصذبح
80
كذم إلذى
/كم 021
من
ساعة بد
/كم 06
. ساعة
تذذذم تصذذذميم الطريذذذق بعذذذدد
6
3– حذذذارات
حارات بكل جهة مع إضذافة حذارة رابعذة فذي
كل
إتجاه
للتوسعة المستقبلية مع توف
ير خدمذة
إنتظار
الشاحنات وجسور المشاة
.
الوضع
الحالي
:
تم
الطرح وجارة
الترسية
.
تطوير وتنفيذ وصيانة الدائري السابع من الطريق الساحلى حدود النويصيب و
حتى الشدادية
(
طريق السابع المرحلة الأولى
)
Develop, execute and maintenance 7th ring road from the coastal road in Al-
Nuwaiseeb road to Al-Shedadiya (7thring road)-( First stage)
The project aims to:
Connecting the Fahaheel highway with
Kabd area by a length of approximately
21,8km. Includes 7 intersections The
project contains the development of the
Seventh Ring road in order to turn its
traffic into a free traffic movement
without any traffic signals, and change
the allowed speed to 80 – 120 km / h
instead of 60 km / h, with all the
infrastructure and landscaping services
with the trees belt along each direction
The road has been designed with 6
lanes – 3 lanes per direction, in addition
to taking in consideration the addition of
a 4
th
lane in each direction for future
expansion with providing truck waiting
services and pedestrians bridges
The current status :
It has been presenting and underway
awarding.
يهدف المشروع إلى
:
مواجهذذذة تزايذذذد الكثافذذذة المروريذذذة نظذذذرا
للتطور العمراني والزيادة السكانية ف
ي هذ ه
المنذذاطق ورفذذع القذذدرة
اوسذذتعابية
ليذذل وتق
الإزدحذذذذذذام
المذذذذذذرورة ورفذذذذذذع مسذذذذذذتوة
الخدمات
.
الطول الإجمالي
. كم 92
الطريذذذذذق الإقليمذذذذذي
–
الجذذذذذزء الجنذذذذذوبي
(
المرحلة اوولى
. )
الطول الإجمالي
. كم 721 :
عدد التقاطعات
:14 .
عدد العبارات المتقاطعة مع جسور الطذرق
السريعة
:22 .
عدد العبارات المتقاطعة مذع جسذور السذك
ة
الحديدية لدول مجلس التعاون الخليجي
:3 .
معابر الجمال
:2 .
الطول الإجمالي
. كم 92:
الوضع
الحالي
:
جارة التصميم والتجهيز للطرح
.