Construct, complete and maintenance roads and

intersections in the southern region from north

Abdullah port – Al-Wafra to North Kabd

The project aims to:

To face the increasing traffic density due to urban

development and population growth in these areas and

raise the absorptive capacity and reduce traffic

congestion and raise the level of services

Total length: 29km

Regional road – southern part (Phase 1)

Total length: 127km

No. of intersections: 14

No. of passageways that are intersecting with the

highway bridges: 22

No. of passageways that are intersecting with the

GCC’’s railway bridges: 3

Camels crossings: 2

Total length: 29km

The current status:

Preparing for presenting..

ُ

مشروع إ

ُ

يهدف ا

:

ا

ُ

ساريع إ

ُ

فحيحيال ا

ُ

طرياق ا

َ

ربط باي

ُ

ا

طقاة

ُ

م

ي

ُ

كبد بطول حوا

( 21.8

كم

)

ويشمل عدد

7

طريااق

ُ

مشااروع تطااوير ا

ُ

تقاطعااات وشاامل ا

مروريا

ُ

حركاة ا

ُ

تصابح ا

ُ

ساابع

ُ

ادائري ا

ُ

ا

ُ

ة عليا

سارع

ُ

أية إشارات مرورية وا

َ

حركة حره بدو

ة

تصابح

ُ ُ

مسموحة علي

ُ

ا

80

ا

ُ

كام إ

120

كام

/

َ

ساعة بدلاً م

60

كم

/

ساعة

.

طريق بعدد

ُ

تم تصميم ا

6

حارات

–3

حارات

بكل جهة مع إ اافة حاارة رابعاة فاي كال

إتجا

اه

مساااتقبلية ماااع تاااوفير خدماااة

ُ

لتوساااعة ا

ُ

ُ

إ

تظاااار

مشاة

ُ

ات وجسور ا

ُ

شاح

ُ

ا

.

الوض الحالي

:

تمت

ترسية

ُ

ا

لتوقيع

ُ

تجهيز

ُ

و جاري ا

.

تطوير وتنفيذ وصيانة الدائر الساب مر الطريد الساحلي حدود النويصيب وحتي الش

دادية

(

طريد

الساب المرحلة الأولي

)

Develop, execute and maintenance 7th ring road from

the coastal road in Al-Nuwaiseeb road to Al-Shedadiya

(7thring road)-( First stage)

The project aims to:

Connecting the Fahaheel highway with Kabd area

by a length of approximately 21,8km. Includes 7

intersections The project contains the development

of the Seventh Ring road in order to turn its

traffic into a free traffic movement without any

traffic signals, and change the allowed speed to 80

– 120 km / h instead of 60 km / h, with all the

infrastructure and landscaping services with the

trees belt along each direction

The road has been designed with 6 lanes – 3

lanes per direction, in addition to taking in

consideration the addition of a 4th lane in each

direction for future expansion with providing truck

waiting services and pedestrians bridges

The current status :

Presented, and preparing for signing

ُ

مشروع إ

ُ

يهدف ا

:

لتطاا

ُ ً

ظاارا

ُ

مروريااة

ُ

كثافااة ا

ُ

مواجهااة تزايااد ا

ور

اطق

ُ

م

ُ

ية في هذه ا

ُ

سكا

ُ

زيادة ا

ُ

ي وا

ُ

عمرا

ُ

ا

ورفاع

قدرة

ُ

ا

الأستعابية

وتقليل

الإزدحام

مرور

ُ

ا

ي ورفاع

خدمات

ُ

مستوي ا

.

ي

ُ

طول الإجما

ُ

ا

29

كم

.

طريااق الإقليمااي

ُ

ا

ااوبي

ُ

ج

ُ

جااازء ا

ُ

ا

(

مرحلااا

ُ

ا

ة

ُ

الأو

. )

ي

ُ

طول الإجما

ُ

ا

: 127

كم

.

تقاطعات

ُ

عدد ا

:14 .

طااارق

ُ

متقاطعاااة ماااع جساااور ا

ُ

عباااارات ا

ُ

عااادد ا

سريعة

ُ

ا

:22 .

ح

ُ

سكة ا

ُ

متقاطعة مع جسور ا

ُ

عبارات ا

ُ

عدد ا

ديدية

خليجي

ُ

ا

َ

تعاو

ُ

دول مجلس ا

ُ

:3 .

جمال

ُ

معابر ا

:2 .

ي

ُ

طول الإجما

ُ

ا

:29

كم

.

الوض الحالي

:

جاري

تجهيز

ُ

ا

لطرح

ُ

.

26