RoadProjects

يهدف المشروع إلى

ـ :

شمتوا ةعمذوس ع م و فد

20

ةو باةشودً مود اسشو ةعواةئسز

ةع وو اس تتوو تقوو اط سقوو

82

مووط ةعاسشوو ةىق شمووي

ةعذم عي

(

ةعسةبا ةعذسقي

ةعصسبي

)

ةعاسش ةى

ق شمي

ةعج بي عشسبا ببعء ذم م ةعبلاا ج به ا شذ

تمم

م سشد

(4

ت سة عةم إتجو ت

)

4 واا

تق اعو

معبس ع ةد ةعتاشا ةىق شمشد ةعمزمط إ ذ ئه

.

الوضع الحالي

:

تم ةعتس شد ج سز ةعتجهشز ع ت قشط

.

The project aims to:

The first contract extends to a distant of

20km from the Sixth Ring road towards

Al-Salmi

road, and meets with

intersection 82 with the southern

Regional road and the linking Abdali road

(eastern – western), connecting the

southern part of the country with its

northern part. The first phase includes 2

ways, each containing 4 lanes and covers

4 intersections and a passageway to the

regional railway

The current status :

Awarded, and preparing for signing

إ

نشاء و

إ

نجاز وصيانة الطريق الإ

قليمي

الشمالي من الدائري الساد

س

لىإ

تقاطع رقم

(4 )

Construct, complete and maintenance the northern

regional road from 6th ring road to intersection no (4)